• Home
  • About us
    • About us
    • Company history
    • Business areas
    • Factory System
  • Product
    • Steel Pole
    • Bulong neo
    • Bars, Earthing
    • Solar battery holder
    • Export products
  • Project
    • Project 110kv
      • Ha Tay 110kV line steel poles
      • Steel pole of 110kV Hai Phong line
      • Long An 110kV line steel pole
      • Steel pole of 110kV Vu An line
      • Tay Nguyen 110kV line steel pole
    • Project 220kv
      • Steel poles of 220kV Cau Mau transmission line
      • Steel poles, steel beams 220kV Bac Ninh substation 2
    • Project 500kv
      • Steel poles of 500kV Cau Mau transmission line
    • Export project
    • Other projects
  • Customer
    • Typical customers
    • Customer reviews
  • News
    • Specialized news
    • Company news
  • Recruitment
Lot F2, Road N3-2, Dai Dong Industrial Park, Hoan Son, Tien Du, Bac Ninh (+84) 0934 591 488 info@cokhingaicau.vn
  • Englishen
    • Tiếng Việtvi
  • Home
  • About us
    • About us
    • Company history
    • Business areas
    • Factory System
  • Product
    • Steel Pole
    • Bulong neo
    • Bars, Earthing
    • Solar battery holder
    • Export products
  • Project
    • Project 110kv
      • Ha Tay 110kV line steel poles
      • Steel pole of 110kV Hai Phong line
      • Long An 110kV line steel pole
      • Steel pole of 110kV Vu An line
      • Tay Nguyen 110kV line steel pole
    • Project 220kv
      • Steel poles of 220kV Cau Mau transmission line
      • Steel poles, steel beams 220kV Bac Ninh substation 2
    • Project 500kv
      • Steel poles of 500kV Cau Mau transmission line
    • Export project
    • Other projects
  • Customer
    • Typical customers
    • Customer reviews
  • News
    • Specialized news
    • Company news
  • Recruitment
Contact
  • For Ngai Cau

    “Customer's benefit is the enterprise's benefit”

    Contact
  • For Ngai Cau

    “Customer's benefit is the enterprise's benefit”

    Contact

Professional mechanical manufacturing?

Ngai Cau Building and Commercial Investment Joint Stock Company is a unit specializing in mechanical processing and hot-dip galvanizing : steel poles, anchor bolts,equipment support pillar, substations, 110-500kV lines, steel beams, earthing, substation equipment and other steel structure items.

  • Quality control system, 100% satisfaction guarantee
  • Unparalleled workmanship, professional and qualified
  • Environmentally sensitive, personalized solutions
Read More
Products

Featured products

View more
Bulong neo

Bulong neo

All bolt body steel is tested to ensure the correct steel grade and steel strength before processing. The threads on the bolt body are all turned without cutting saw tooth according to the TCVN specified in the design of the project. After being hot-dip galvanized, Bolt and nut  are screwed into sets to ensure easy […]

Bars, Earthing

Bars, Earthing

With many years of experience in manufacturing steel beams, our products are not only technically easy to install, but also highly aesthetic. All punch holes and welds are cleaned, without bavia before hot-dip galvanizing. Materials for manufacturing steel beam products have clear origin, are strictly checked in terms of geometrical dimensions before being warehoused and […]

Export products

Export products

Đi lên từ niềm mơ ước sản xuất được những sản phẩm cơ khí với chất lượng Nhật Bản ở đất nước Việt Nam, chúng tôi đã không ngừng nỗ lực học tập phong cách quản trị kinh doanh kiểu Nhật. Tất cả các cán bộ quản lý đều được tham gia chương trình đào […]

Projects

Construction

  • Project Completed
  • Works In Progress
View more

Ha Tay 110kV line steel poles

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

220KV Phan Ri substation

- Dự án TBA 220 kV Phan Rí do Tổng công ty Truyền tải điện Quốc gia (EVNNPT) làm chủ đầu tư, SPMB thay mặt EVNNPT điều hành quản lý dự án. Công ty Cổ phần Tư vấn Xây dựng điện 3 là đơn vị thiết kế, Công ty Cổ...
View more

110kV EASUOP substation and connection.

- Dự án TBA 110kV Ea Soup và đấu nối được đầu tư xây dựng trên địa bàn 3 huyện Cư M’Gar, Buôn Đôn và Ea Soup thuộc tỉnh Đắk Lắk có quy mô xây dựng mới đường dây 110kV dài 66,7km, 01 ngăn xuất tuyến 110kV và 01 TBA...
View more

Increase capacity of 500kV Thuong Tin substation

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more
News

News

  • Company news
  • Specialized news
View All
Aug Thu 2023 - 0 Comment

At Ngai Cau, employees’ workspaces are given maximum attention

View more
Aug Thu 2023 - 0 Comment

What factors determine the success of a steel structure project?

View more
Aug Thu 2023 - 0 Comment

Ngai Cau Mechanical – Summary meeting with company employees

View more

Typical Customers

  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco

Ngai Cau Trading and Construction Investment Joint Stock Company

  • Factory at Lot F2, Road N3-2, Dai Dong Industrial Park

    Hoan Son, Tien Du, Bac Ninh.
  • 02222221258

LINK

Certificate:

Map

All rights reserved. Powered by Gmo

0934 591488
x
x
Facebook Cơ Khí Ngãi Cầu
Facebook Cơ Khí Ngãi Cầu