220KV Power Line Loc Ninh – Binh Long 2
Construction Mechinery Joint Stock Company No. 26 (Coma 26) is the construction unit of 220KV Loc Ninh - Binh Long 2 directly ordering steel poles of Ngai Cau. - 220kV Loc Ninh - Binh Long 2 Power Line project…
110kV Son La – Muong La Mach 2 Power Line
The project was started on June 5, 2015 with Scale: Expanding 1 “110kV road block” at Nam Hong 2 Hydropower Station. New construction 28km of 110kV transmission line with 2-conductor circuit ACSR240mm2 including two lines. Route 1 from 220kV Son La Substation to pole position 74, 110kV transmission line circuit 1. Route 2 from pole 20, 110kV line of Nam Lum Hydropower 1 to Nam Hong 2 Hydropower Substation.
Deployment items: Steel Poles, pillar foundations, bolts
The 110kV transmission line supplies power to the 110kV Yen Bai 2 substation and the 110kV Cuu Long Vinashin substation
Solar Park 3.4 . Solar Power
The project was started from February 2019 including Solar Park 1 and Solar Park 2 solar power plants built on an area of 118 hectares in Hamlet 3, Binh Hoa Nam Commune, Duc Hue District, Long An Province. Syouei Alliance (Japan) – TWT….
Xuan Thien Ea Sup Solar Power Plant Project
Phase 1 of Xuan Thien Ea Sup Solar Power Plant Project has nearly two million solar panels, with a capacity of 600 MWac/831 MWp, a 500 kV/1,200 MVA substation and 22.2 km of 500kV transmission lines, with an investment of nearly 20,000 billion VND, electric…
Trung Nam Thuan Nam solar power project
The largest 450MW Trung Nam Thuan Nam solar power project in the country and Southeast Asia with the first 500kV transmission and substation system invested by the private sector. Project of 500kV substation and 220/500kV transmission line combined with Solar Power Plant…
Project: Output 110kV line after 220kV Lang Son substation
- HA NOI ASSEMBLE ELECTRICITY JOINT STOCK COMPANY is the construction unit of the project: Output 110kV line after 220kV Lang Son substation directly order steel poles, anchor bolts, Earthing of Ngai Cau. - The Output 110kV project after the Lang Son 220kV substation belongs to…
Steel poles, steel beams 220kV Bac Ninh substation 2
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020

Mr Trần Văn Bộ
Giám đốc, Công ty xây lắp điện công nghiệp
Chúng tôi đánh giá cao công ty Ngãi Cầu ở việc đáp ứng tiến độ cho khách hàng, khi chúng tôi cần gấp các sản phẩm phục vụ cho nhưng đơn hàng gấp khắc phục sự cố hay sửa chữa đường dây điện

Mr Trần Văn Bộ
Giám đốc
Chúng tôi đánh giá cao công ty Ngãi Cầu ở việc đáp ứng tiến độ cho khách hàng, khi chúng tôi cần gấp các sản phẩm phục vụ cho nhưng đơn hàng gấp khắc phục sự cố hay sửa chữa đường dây điện
Liên hệ
Nhận tư vấn ngay
Cộng sự
Khách hàng tiêu biểu