Construction Mechinery Joint Stock Company No. 26 (Coma 26) is the construction unit of 220KV Loc Ninh - Binh Long 2 directly ordering steel poles of Ngai Cau. - 220kV Loc Ninh - Binh Long 2 Power Line project…
The project was started on June 5, 2015 with Scale: Expanding 1 “110kV road block” at Nam Hong 2 Hydropower Station. New construction 28km of 110kV transmission line with 2-conductor circuit ACSR240mm2 including two lines. Route 1 from 220kV Son La Substation to pole position 74, 110kV transmission line circuit 1. Route 2 from pole 20, 110kV line of Nam Lum Hydropower 1 to Nam Hong 2 Hydropower Substation.
Deployment items: Steel Poles, pillar foundations, bolts
The project was started from February 2019 including Solar Park 1 and Solar Park 2 solar power plants built on an area of 118 hectares in Hamlet 3, Binh Hoa Nam Commune, Duc Hue District, Long An Province. Syouei Alliance (Japan) – TWT….
Phase 1 of Xuan Thien Ea Sup Solar Power Plant Project has nearly two million solar panels, with a capacity of 600 MWac/831 MWp, a 500 kV/1,200 MVA substation and 22.2 km of 500kV transmission lines, with an investment of nearly 20,000 billion VND, electric…
- HA NOI ASSEMBLE ELECTRICITY JOINT STOCK COMPANY is the construction unit of the project: Output 110kV line after 220kV Lang Son substation directly order steel poles, anchor bolts, Earthing of Ngai Cau. - The Output 110kV project after the Lang Son 220kV substation belongs to…
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020
Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE
Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.
Total capacity: 280 MW
Client: HBRE
Location: Ea H’leo, Dak Lak, Viet Nam
Start date: 2017
Completion date: 2020