• Home
  • About us
    • About us
    • Company history
    • Business areas
    • Factory System
  • Product
    • Steel Pole
    • Bulong neo
    • Bars, Earthing
    • Solar battery holder
    • Export products
  • Project
    • Project 110kv
      • Ha Tay 110kV line steel poles
      • Steel pole of 110kV Hai Phong line
      • Long An 110kV line steel pole
      • Steel pole of 110kV Vu An line
      • Tay Nguyen 110kV line steel pole
    • Project 220kv
      • Steel poles of 220kV Cau Mau transmission line
      • Steel poles, steel beams 220kV Bac Ninh substation 2
    • Project 500kv
      • Steel poles of 500kV Cau Mau transmission line
    • Export project
    • Other projects
  • Customer
    • Typical customers
    • Customer reviews
  • News
    • Specialized news
    • Company news
  • Recruitment
Lot F2, Road N3-2, Dai Dong Industrial Park, Hoan Son, Tien Du, Bac Ninh (+84) 0934 591 488 info@cokhingaicau.vn
  • Englishen
    • Tiếng Việtvi
  • Home
  • About us
    • About us
    • Company history
    • Business areas
    • Factory System
  • Product
    • Steel Pole
    • Bulong neo
    • Bars, Earthing
    • Solar battery holder
    • Export products
  • Project
    • Project 110kv
      • Ha Tay 110kV line steel poles
      • Steel pole of 110kV Hai Phong line
      • Long An 110kV line steel pole
      • Steel pole of 110kV Vu An line
      • Tay Nguyen 110kV line steel pole
    • Project 220kv
      • Steel poles of 220kV Cau Mau transmission line
      • Steel poles, steel beams 220kV Bac Ninh substation 2
    • Project 500kv
      • Steel poles of 500kV Cau Mau transmission line
    • Export project
    • Other projects
  • Customer
    • Typical customers
    • Customer reviews
  • News
    • Specialized news
    • Company news
  • Recruitment
Contact
Chi tiết dự án

Lao Cai Power Company

  • Project information

  • Location

  • Customer

  • Completion time

Project

Project

  • Project Completed
  • Works In Progress
220KV Power Line Loc Ninh – Binh Long 2

220KV Power Line Loc Ninh – Binh Long 2

Construction Mechinery Joint Stock Company No. 26 (Coma 26) is the construction unit of 220KV Loc Ninh - Binh Long 2 directly ordering steel poles of Ngai Cau. - 220kV Loc Ninh - Binh Long 2  Power Line  project…

View more

110kV Son La – Muong La Mach 2 Power Line

The project was started on June 5, 2015 with Scale: Expanding 1 “110kV road block” at Nam Hong 2 Hydropower Station. New construction 28km of 110kV transmission line with 2-conductor circuit ACSR240mm2 including two lines. Route 1 from 220kV Son La Substation to pole position 74, 110kV transmission line circuit 1. Route 2 from pole 20, 110kV line of Nam Lum Hydropower 1 to Nam Hong 2 Hydropower Substation.

Deployment items: Steel Poles, pillar foundations, bolts

 

View more

The 110kV transmission line supplies power to the 110kV Yen Bai 2 substation and the 110kV Cuu Long Vinashin substation

View more
Solar Park 3.4 . Solar Power

Solar Park 3.4 . Solar Power

The project was started from February 2019 including Solar Park 1 and Solar Park 2 solar power plants built on an area of 118 hectares in Hamlet 3, Binh Hoa Nam Commune, Duc Hue District, Long An Province. Syouei Alliance (Japan) – TWT….

View more
Xuan Thien Ea Sup Solar Power Plant Project

Xuan Thien Ea Sup Solar Power Plant Project

Phase 1 of Xuan Thien Ea Sup Solar Power Plant Project has nearly two million solar panels, with a capacity of 600 MWac/831 MWp, a 500 kV/1,200 MVA substation and 22.2 km of 500kV transmission lines, with an investment of nearly 20,000 billion VND, electric…

View more
Trung Nam Thuan Nam solar power project

Trung Nam Thuan Nam solar power project

The largest 450MW Trung Nam Thuan Nam solar power project in the country and Southeast Asia with the first 500kV transmission and substation system invested by the private sector. Project of 500kV substation and 220/500kV transmission line combined with Solar Power Plant…

View more

Vinh Tan 500kV transmission line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

500kV Vinh Phuc transmission line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

Vinh Long 500kV transmission line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

500kV Kien Giang transmission line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

Dai Can 500kV transmission line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

Can Tho 500kV line

Vietnam's fourth and largest Wind farm ever built in Vietnam, using most state-of the-art turbines and systems by GE

Total investment: 0.56 billion USD engineering, procurement, supply, construction and commissioning contract.

Total capacity: 280 MW

Client: HBRE

Location: Ea H’leo, Dak Lak, Viet Nam

Start date: 2017

Completion date: 2020

View more

Khách hàng tiêu biểu

  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco
  • vneco

Ngai Cau Trading and Construction Investment Joint Stock Company

  • Factory at Lot F2, Road N3-2, Dai Dong Industrial Park

    Hoan Son, Tien Du, Bac Ninh.
  • 02222221258

LINK

Certificate:

Map

All rights reserved. Powered by Gmo

0934 591488
x
x
Facebook Cơ Khí Ngãi Cầu
Facebook Cơ Khí Ngãi Cầu